|
GLA Construction Advisories
Site Home > Construction
|
West LA Campus
|
|
Construction Advisory
Location: B 500, West Entrance walkway
Date: Monday, March 4th, 2013
Time: 5am – 12 noon
1. The West Walkway from Dowlen Drive to the B500 - West Entrance, will be closed temporarily, due to the removal of the 3W construction elevator.
The West Entrance will be open, however;
2. The Smoking Shelter near the West Entrance will not be accessible during this time.
3. The West Entrance stairs and landing will be open.
4. All Handicap accessibility will need to be from the B500 front Main Hospital Entrance during this time.
|
| |
|
Sepulveda Ambulatory Care Center
|
| |
| No major construction at this time |
|
|
Los Angeles Ambulatory Care Center
|
| |
| No major construction at this time |
| |
|